EPC CONTRACTOR FOR
NON REVENUE WATER (NRW) PROJECTS
International Aramoon Co. Ltd. (IAC) is a pioneer in water network management services using the latest advanced technologies and following IWA standards. IAC is the leading NRW EPC Contractor in Saudi Arabia for intermittent and continuous supply water distribution network management.
"PIONEER IN WATER LOSS MANAGEMENT"
Our Services in
Water Distribution System
Survey & GIS
DMA / DMZ Design & Validation
Smart System WATCHLEAK water network management
Hydraulic Modeling
Water Leak Detection
Advanced Pressure Management
DMZ Scada sytem & Control Room Installation
Water Network Instrumentation
Pipeline Installation
FIELD DATA COLLECTION & GPS SURVEY
NETWORK AUDIT
NETWORK DATA MANAGEMENT
UPDATE DRAWINGS & GIS
DMA / DMZ DESIGN & INSTALLATION
HYDRAULIC MODELING
Study In The Distribution Network, Assess And Develop Different Scenarios And Calibration To Identify Network Real Operational Condition And Improvement For Permanent Monitoring.Real-Time Modeling And Decision Support Using Hydraulic Modeling Software.The System Will Provide Network Operators With A Decision Support Tool That Has The Capabilities To Run Scheduled Models, Fetch And Manage Real-Time Data, Prepare Reports For Important / Critical Elements In The Network,Perform Realtime Optimization (For The Network )
WATER LEAK DETECTION
IAC is higly experienced in locating hidden leaks and reducing the water loss in the network.We use very sophisticated and latest technology to pinpoint the LEAKS with well experience engineers and technicians.
ADVANCED PRESSURE MANAGEMENT
Automatically And Continuously Optimise Pressure Across The Network, Based On The Current Demand Patterns And Operating Characteristics Of That Area Of The Network.
SCADA SYSTEM & CONTROL ROOM
Supply And Installation Of Supervisory Control And Data Acquisition (SCADA) Computer System Hardware, Software And Peripherals.
Install SCADA Servers, Workstations, Client Computer Systems, Communication Hardware And Software.
Install Remote Terminal Unit (RTU)
Pipe Replacement And Installation
House Service Connection Replacement
Survey To Find HSC Needs Replacement And Report To CLIENT To Get Approval For The Replacement.
Replace The Pipes In HSC And Backfilling With Proper Compaction In Different Layers.
Installation Of New Pipe
HDPE Pipe Installation By Electro Fusion Coupling Process
Ductile Iron Pipe Push On Joint Installation
Ductile Iron Pipe Mechanical Joint Installation
UPVC Pipe Installation
FEW NRW MEGA PROJECT LIST
Water Leak Detection, Makkah City
Project duration: 24 months
more
Water Networks Stage 3, Dammam & Al-Khobar for Ministry of Water & Electricity, Dammam
Project Duration: 24 months
more
Develop and improve networks Riyadh phase 4
Project Duration: 36 months
more
Develop and improve networks Riyadh phase 5
Project Duration: 36 months
more